RAMS template for electrical and data cabling work
A risk assessment and method statement laid out the way a main contractor expects to see it. Fill in the job, delete what doesn't apply, send it.

What's inside
| 01 | Job details | Site, client, main contractor, principal designer, dates and the people on the job. |
| 02 | Scope of work | Containment, cabling, terminations and testing, in plain steps. |
| 03 | Risk assessment | Hazards from live working to waste, scored before and after controls. |
| 04 | Substances (COSHH) | Sealants, lubricants, wipes and adhesives, with their controls and data sheets. |
| 05 | Method statement | The sequence of work from isolation to handover. |
| 06 | Permits | Permit to work, hot works and isolation records to attach. |
| 07 | PPE and equipment | What each operative needs before they start, and the inspection records to keep. |
| 08 | Training and competence | Cards and qualifications, and who holds them. |
| 09 | Emergency arrangements | First aid, defibrillator, fire, rescue from height and site contacts. |
| 10 | Operative sign-off | Names, card numbers and signatures, briefed before work starts. |
| 11 | Review and acceptance | When to review it, and the principal contractor’s acceptance. |