RAMS template for electrical and data cabling work

A risk assessment and method statement laid out the way a main contractor expects to see it. Fill in the job, delete what doesn't apply, send it.

We'll email you this download. If you tick the box, we'll also send occasional tips, and you can unsubscribe at any time. See our privacy policy.

Page 1 of the RAMS template

What's inside

01Job detailsSite, client, main contractor, principal designer, dates and the people on the job.
02Scope of workContainment, cabling, terminations and testing, in plain steps.
03Risk assessmentHazards from live working to waste, scored before and after controls.
04Substances (COSHH)Sealants, lubricants, wipes and adhesives, with their controls and data sheets.
05Method statementThe sequence of work from isolation to handover.
06PermitsPermit to work, hot works and isolation records to attach.
07PPE and equipmentWhat each operative needs before they start, and the inspection records to keep.
08Training and competenceCards and qualifications, and who holds them.
09Emergency arrangementsFirst aid, defibrillator, fire, rescue from height and site contacts.
10Operative sign-offNames, card numbers and signatures, briefed before work starts.
11Review and acceptanceWhen to review it, and the principal contractor’s acceptance.

Or write it once and get it signed on site.

In Validate Lite, your engineers sign the RAMS on their phone before they start. You see who has signed, and it files itself against the job.

An engineer signing on a phone on site